With an eye on the forecast, and heavy rains the past few days, we’re postponing our 8/13 trail work day until early September. If you’ve ever been caught up in Signal Peak in the rain or snow, you’ve experienced the impassable death mud thicker than Elmer’s glue on a preschool arts and crafts table. We’re bummed to have to move the workday, but we’ve been psyched on all the late season moisture. See below for an updated fall trail work schedule, and get out an enjoy the tacky dirt!
- Tuesday, August 27: 4-8pm (South Rim)
- Tuesday, September 3: 4-8pm (Northwoods)
- Saturday, September 14: 9am-2pm BIG FALL WORKDAY (Northwoods)